Adding to the previous question, can the provided GoPower battery charger handle added 3rd or 4th Li batteries wired in parallel on a single bank installed in an adjacent U-Shaped dinette storage compartment. Looks like the battery charger has two charging banks but it might be easier to have multiple parallel batteries on a single bank.
Hello , a question about the Suburban two burner stoves. I have seen stories on social media about gas leaks. Is this a real problem or urban myth? If it is real , what countermeasures are in place to correct the problem? Waiting for my spring delivery of an E19, very excited.
If I get two solar panels and the portable panel option can the charge controller manage all 3 panels? I read that the way the solar charging system was wired that adding the 3rd panel portable panel into the system didn’t necessarily increase charging amperage.
Thank you
Have you decided yet how you are going to manage the Wait List for the 23? There was mention of a drawing to determine production slots for everyone on the Wait List. What is your current plan? Thank you.
I'm going to order a Lithium battery and solar panel for my E19. I'm thinking that one battery will suit my needs but if I have to add a second battery can the same controller handle two batteries or will I need to upgrade the controller.
Adding to the previous question, can the provided GoPower battery charger handle added 3rd or 4th Li batteries wired in parallel on a single bank installed in an adjacent U-Shaped dinette storage compartment. Looks like the battery charger has two charging banks but it might be easier to have multiple parallel batteries on a single bank.
Hello , a question about the Suburban two burner stoves. I have seen stories on social media about gas leaks. Is this a real problem or urban myth? If it is real , what countermeasures are in place to correct the problem? Waiting for my spring delivery of an E19, very excited.
Kind Regards
Robert Scanlon
If I get two solar panels and the portable panel option can the charge controller manage all 3 panels? I read that the way the solar charging system was wired that adding the 3rd panel portable panel into the system didn’t necessarily increase charging amperage. Thank you
Brandon Snider
Have you decided yet how you are going to manage the Wait List for the 23? There was mention of a drawing to determine production slots for everyone on the Wait List. What is your current plan? Thank you.
Hello, what is the approximate weight of the Escape 17b? Thanks.
I just signed off my final build sheet on my 21C two weeks before it was due. Will this possibility move up my guaranteed delivery date?
What are the dimensions of the twin beds?:)
I'm going to order a Lithium battery and solar panel for my E19. I'm thinking that one battery will suit my needs but if I have to add a second battery can the same controller handle two batteries or will I need to upgrade the controller.